GET MY INSTANT ROOF QUOTE

Stop the Drip: The Hidden Science of Concrete Roof Failure.

Protect Your Asset: Why Invisible Cracks Are Your Building’s Biggest Liability.

90%

icon-hover-out-02
Precision-Match Estimates: real-world remedial data to give you an accurate live quote instantly.

68k

icon-hover-out-03
Project Savings. Reduce time and procurement costs now.
THE REMEDIAL BUILDERS P/L | BUILD-SURETY

Roof Remedial & Waterproofing

Fast Quotes & Easy Comparison for Strata Managers & Homeowners

0
1
2
3
4
New Steel Edge Capping ($65/Lm)

Assessment Summary

ESTIMATED SOLUTION TOTAL
$0
Case - study

Concrete Roof Waterproofing (Sydney NSW) 2025

Intro — Problem & Root Cause
A strata building in Sydney had repeated roof leaks affecting top-floor units. Previous patch repairs didn’t last. Our inspection showed cracks, ponding water, and a failed membrane coating. The root cause was no flexible waterproofing layer and poor drainage setup.

Ave Cost: $120 per m²
“Liquid-membrane waterproofing (2-layer system) — depending on condition, preparation need and complexity.”
Warrantly
6 years
Blue Background

Work done

  • Cut open cracked areas and repaired them
  • Treated weakened concrete
  • Rebuilt low spots to improve water flow

Key point: All repairs were bonded securely to the existing concrete.
Report: We sent before/after photos showing cracks, repairs, and surface prep.

Work done: Applied a full waterproofing system

  • Primer/base coat
  • Flexible membrane
  • UV-protected top coat for durability

Testing: A flood test confirmed the roof was fully watertight.
Report: Owners received photos of each waterproofing layer and test results.

Work done:

  • Applied smooth finishing coat
  • Sealed all roof penetrations (pipes, vents, drains)
  • Added flexible joints at high-movement areas

Reporting Summary: Throughout all stages we provided:
Clear photo updates / Progress reports / Critical inspection checks / Product and compliance details

Case - study

Roof Waterproofing with Torch-On Bitumen Membrane

The client was experiencing ongoing roof leaks after heavy rain. Previous patch repairs failed repeatedly. We installed a new torch-on waterproofing membrane system over the prepared surface to permanently stop water entry.

Why We Use Torch-On Bitumen Membrane

  • Heavy-Duty & Long-Lasting – Designed for harsh weather
  • Excellent UV Resistance – Protects from sun damage
  • Fully Waterproof & Seam-Sealed – No weak joints
  • Flexible with Building Movement – Reduces cracking
  • Low Maintenance – Long service life
  • Ideal for Flat & Low-Slope Roofs
Ave Cost 145 per m²
(depending on condition and complexity)
Warrantly
15–25+ years
Blue Background
1
Stage 1 – Crack Repairs & Surface Preparation
The roof surface was cleaned and fully prepared to ensure strong membrane bonding.
💡 Value: Prevents future membrane lifting and early failure.
2
Stage 2 – Priming the Roof Surface
Purpose: Create a strong bonding layerA bitumen primer was applied to the full roof area to improve membrane adhesion and seal the concrete surface.
💡 Value: Increases membrane lifespan and prevents air bubbles.
3
Stage 3 – 2-Layer Torch-On Membrane Installation
System: Base layer + Cap sheet (UV protected) / All seams were fully welded for maximum waterproof protection.
💡 Value: Dual-layer system gives maximum waterproof safety and durability.
4
Stage 4 – Final Water Testing & Inspection
After curing, the roof was water-tested to confirm full waterproof performance before final approval.
All Service
Get a Quote